Production boundary

Replace evaluation proof with real provider proof before live employee data.

EyeLogs HRM can run structured UAT with evaluation records without breaking. A production hospital or company rollout needs verified email delivery, secure document storage, clean database migrations, and external acceptance signatures.

What EyeLogs can complete

Code and verification work we can own.

EmailProduction email deliveryConnect the approved mail provider, keep production settings current, send invite/reset emails, and show real delivery only when the provider confirms it.
StorageSecure document vaultConnect approved object storage, create signed upload/download URLs, record file proof, and audit document access.
DatabaseMigration repairMaintain production database migrations, add idempotent repair migrations, avoid public crashes, and verify live endpoints after deployment.
ApprovalAcceptance templatesProvide UAT, payroll validation, case study approval, onboarding, and support/SLA templates for buyer handoff.
What must be real

These cannot be honestly replaced by internal evaluation records.

Production configuration

Minimum production settings to remove review-mode storage warnings.

Email providerVerified sender/domain, production API key, from address, invite delivery proof, reset delivery proof, bounce handling, and audit evidence.
Document storageApproved storage bucket, scoped access keys, signed upload/download URLs, retention policy, restore proof, and document access audit.
Security configurationStrong signing secrets, MFA encryption/recovery secrets, allowed web origin, production database connection, and no shared secrets in public pages.
Migration commandRun the approved production migration deploy after the baseline is resolved. Do not claim production readiness while schema drift remains.
Go-live rule

If readiness shows review-mode storage, the product is UAT ready, not production complete.

Use this page during sales calls so the buyer sees the exact path from structured evaluation to safe production rollout.

Open HRM readiness